| Project type |
Organisation |
Date |
Comments |
| Pre-cast Concrete Construction |
Bison Concrete Products Ltd |
2007 |
The use of Pre cast concrete construction has the potential to reduce on site construction wastage by 50% when compared to traditional build construction. |
| Off site fabrication of backwalls and panels |
Off site fabrication, Sainsbury's |
2008 |
The use of a consolidation centre and off site fabrication in store fit out and refurbishment offers a range of savings to Sainsbury's. |
| Kitchen and Bathroom Pod Construction |
Off Site Solutions (RT) Limited |
2007 |
The use of off site POD manufacture has the potential to reduce on site wastage by 50% when compared to traditional construction. |
| Light Steel Frame Construction |
Framing Solution plc |
2007 |
The use of LSF off site construction has the potential to reduce on site wastage by 70% compared to traditional construction. |
| SmartLIFE Cambridge |
2008 |
The use of light steel frame construction to build 35 homes offers waste minimisation efficiencies. |
| Timber Frame Construction |
Stewart Milne Timber Systems |
2007 |
The use of timber frame construction has the potential to reduce on site construction wastage by 40% when compared to traditional construction. |
| SmartLIFE Cambridge |
2008 |
The use of timber frame construction to build 15 homes demonstrated the potential to minimise waste. |
| Volumetric Construction |
Yorkon Limited |
2007 |
The use of Volumetric construction has the potential to reduce on site construction wastage by 70% compared to traditional construction. |
| Sure Start Children's Centres, Hertfordshire |
2008 |
The use of a factory fabricated building system on seven children's centres in Hertfordshire demonstrates a range of benefits and waste minimisation potential. |
| NATO Headquarters, Middlesex |
2008 |
The use of volumetric construction in the redevelopment of the NATO headquarters in Northwood, Middlesex offered a range of benefits. |