Kitchen and Bathroom POD Construction

Date
2007
Documents
pdf file PODS - Full case study.pdf 
(204 kb)
pdf file Pod summary case study 
(79 kb)

The use of POD construction on site has the potential to reduce on site wastage rates.

Off site Solutions has been identified as an exemplar to demonstrate the manufacturing process that has been developed to reduce production wastage.

Key facts:

  • The use of POD off site construction has the potential to reduce on site  construction wastage by 50% compared to traditional build.
  • The production process has a wastage rate of 1% at the factory and 0% on site.