Demolition and Regeneration Case Studies

Project type Organisation Date Comments
Residential Block demolition Coleman and Co. 2007 96% of demolition arisings were recycled, exceed the 70% target for the project
Urban Regeneration Raploch Urban Regeneration Company 2008 Raploch URC and Stirling Council applied the principles of the WRAP Regeneration Guide and saw an estimated £37,500 to £60,000 saving.
Hospital demolition Keltbray 2007 As a result of a soft strip demolition method 97.1% of demolition arisings were recycled.
Manufacturing site demolition Maxigrade Limited 2007 Immediate source segregation of demolition arisings led to a recovery rate of over 95%.
Commercial building demolition Cuddy Group 2007 98% of demolition arisings were recycled on this space and time constrained demolition project.