| Residential Block demolition |
Coleman and Co. |
2007 |
96% of demolition arisings were recycled, exceed the 70% target for the project |
| Urban Regeneration |
Raploch Urban Regeneration Company |
2008 |
Raploch URC and Stirling Council applied the principles of the WRAP Regeneration Guide and saw an estimated £37,500 to £60,000 saving. |
| Hospital demolition |
Keltbray |
2007 |
As a result of a soft strip demolition method 97.1% of demolition arisings were recycled. |
| Manufacturing site demolition |
Maxigrade Limited |
2007 |
Immediate source segregation of demolition arisings led to a recovery rate of over 95%. |
| Commercial building demolition |
Cuddy Group |
2007 |
98% of demolition arisings were recycled on this space and time constrained demolition project. |
| Housing demolition |
Reigart |
2007 |
Helped by the consistent nature of the buildings 95-9% recycling of demolition arisings was acheived. |